I have previously posted about the design phase of this project. At that time, the project was scheduled to commence in August 2011. However, the client was not ready to begin until January of this year, since which time I have not made any further posts, yet there has been a lot of progress. In fact, all of the structural, block work and rendering has been completed. We are now in the process of fitting windows, tiling and painting.
As it is a long time since I have posted about this project, I shall include the original 3D rendering again.