In January, we were approached by a client to design their new home. Having started the design and engineering in February we were complete by the end of March. The house has two bedrooms, three bathrooms, open plan kitchen, dining and living room, a large home theatre room, garage with automatic roller door, a laundry room and a covered terrace at the rear.
We began construction just before the break for the Songkran festival. Currently, we have poured all of the concrete footings and are tying all of the re-bar cages for the grade beams.