Pile Driving

We have begun pile driving, amongst other things, and this video shows the process of adding single pile. We are using 15 meter piles, driven to a depth of 16 meters. You will see in the video that once the pile is driven as far as it can go, and extension is added and it driven the additional meter to be at the correct depth. We will later excavate around the pile head in order to cast the concrete pile head mounting that will transfer the load from the columns and beams of the structure onto the piles.