More rendering plus 'wing' construction

It's been a few days since my last post, but this is not to say that there has been no activity on site.  Most of the exterior has now been rendered.  The down pipes have been fitted to the roof guttering and today the concrete supports have been prepared for the brick work that will box in the drain pipes.  Also over the last couple of days, work has started on producing the steel structure for the 'wing' which will be fitted to the roof.

Roof wing frame structure Roof wing frame structure