A lot of progress with the ground floor beam structure

It seems to have been a very productive day today, with the basic beam structure for the ground floor laid out. Tomorrow, additional steel re-enforcement will be added in areas where greater loads are to be carried. There are also addition beam structures to be added between the primary beams.

Result of a days work installing beam re-enforcement structure Result of a days work installing beam re-enforcement structure

Additional beam re-enforcement added in high stress areas Additional beam re-enforcement added in high stress areas - in this case where an additional beam is to be connected in the area around the staircase structure