Completion of first stage columns

The rest of the first stage columns were poured today. The shuttering was removed from those poured yesterday and the holes in which they stand filled in.  We also took delivery of more materials in preparation for construction of the ground floor support beams.

First stage column casting First stage column with concrete set and shuttering removed

Filling in the footing holes Filling in the footing holes

First ten footing holes filled First ten footing holes filled

Another 3 tonnes of steel arrives ready for beam construction Another 3 tonnes of steel arrives ready for beam construction