When we were first approached, the design project was well underway. Our client had already been working with an architect in Australia for a number of years developing an architectural concept. This concept has remained largely unchanged, so I can not take credit for all of the architectural design, however we have worked with the client to make tweaks and alterations to achieve a final design. We also carried out all of the necessary structural analysis, electrical and plumbing engineering work to produce all of the necessary construction drawings and documentation.
We are still working with the client to look at additional potential refinements to the final design. The construction phase of the project is due for completion before December 2012.